CBR900RR → VF1000R

This morning Aiyama and I handled a delivery and pickup.
The CBR900RR is finally complete, so we loaded it up and delivered it.
 

 
Tokyo was packed this morning, but we arrived at our destination faster than expected.
 

 
We swapped the cargo. ★ Next we loaded up the heavyweight VF1000R.
We headed to the secret shop. We dropped it off and picked up the exhaust pipe and frame we’d had repaired.
“So what should we grab for lunch?” and so
 

 
Pretty tasty! ♪
 

 
That fried chicken is way too big—you can see the cold stare it’s getting. ★
 

 
We headed out to issue the registration certificate while the sun was still up. It’s already 3 PM.
Time flies so fast.

  • Copied the URL !