TZR250R.SP(3XV) Deco-mainte and Parts Corrections

When I happened to look back at my previous post… 2022-07-23
About 3 months stopped.

Oh boy, this is tough (゚Д゚) Progress is slow and steady.

I’d like to swap the meter (used) for a cleaner one.

The ETC antenna and lamp mounting gets really hot, so I’ll fix that.

I want to use the clean parts, so I mixed and matched them.
The serviceability is quite poor. The production efficiency must have been terrible too.

To put it nicely, it’s a complicated structure that takes a lot of work.

Oh, it’s steel. And it has decent thickness too.
I tapped it with M4*0.8 and made an antenna bracket to lock it in place.

That’s how it is (*’▽’)

You want something like this to be firmly fixed. And removable too.

I bent a SUS plate and welded a plate to it for light reinforcement.
As you get older, you become more efficient, I guess (*’▽’)

Steel plate Dual Lock SJ-4570

With this, you’re pretty much good to go. Let me try using it little by little.

I’ve switched everything replaceable to LED.

To be continued.

  • Copied the URL !