GSXR1100K OZ Wheel and Parts Installation

DSC_3735 We’re putting this on hold for now due to material and scheduling constraints. Work will continue. DSC_3713

DSC_3711 The stock part didn’t pass inspection, so we fabricated a replacement. The nut is secured. DSC_3715 We relocated the wobbly analog oil temperature gauge. This time we used a carbon plate. We’ll handle the meter assembly frame mount another time. DSC_3709 Here’s how it looks. DSC_3698 We shortened and thinned the nuts and bolts to avoid contact. M8 gets a 12 mm hex width and M10 gets a 14 mm hex width. This makes it smaller and lighter. DSC_3726 Thanks to the step, we were able to move it inward. DSC_3728 We ran the wiring. Is it 2.5 sq? Since we jump from 2 to 3, we’re reusing wire from the junk pile. DSC_3729 There was a spot where the cover barely touched, so we milled it down 1.3 mm. DSC_3722 The bolts arrived, so we swapped them out and it looks clean now. DSC_3704 The torque rod was long, so we cut it and welded it with plenty of bevel. DSC_3723 This is how it looks. We’re putting it on hold for now.

  • Copied the URL !