K1200S Inspection and ETC Relocation

dsc_2090
The ETC unit hasn’t been working quite right lately. Since the inspection is already complete, let’s relocate it.

p1630138
There’s hardly anywhere to mount screws, and with this integrated unit, finding a suitable location is tricky.
I drilled out the screw holes and made them flush with the surface.

p1630137
Since it contacts things all over the place, the bracket keeps getting smaller and smaller.

p1630140
There’s one M5 bolt under the top bridge, and that’s where I got the main mounting point.

p1630135
Since one point seemed risky, I added a hook for additional support.

p1630136
I also bent the sides to reinforce the bracket.

dsc_2087
This is the initial test fit shape.

p1630141
I originally planned to secure it on both sides, but since the unit has an M4 boss sticking out, I ended up using one bolt for mounting and double-sided tape.

I also did some deburring while I was at it.

p1630142
After polishing and installing, it looks like this.

p1630139
It sits in this gap and gets some protection that way.

p1630143 p1630144dsc_2088
This time it’s truly an integrated unit, so finding the right spot was really challenging.

p1630145
The underside was pretty tight too. But from here, it should be easy to insert and remove the card.

  • Copied the URL !