Bandit 1200 Flat-Rate Motorcycle Inspection, Clutch Hose Fabrication, Muffler Ceramic Coating, and More

DSC_1528
The inspection is complete, so we’re moving forward with the clutch hose and everything else.

DSC_1526
It came out clean and simple.

P1620171
We deliberately went for a good angle with the fitting.

P1620172
We cut it to the length needed. Off-the-shelf options are usually too long, which is disappointing.

P1620168
They wanted both sides to use cotter pins for easy removal. If you don’t need the lever too far out, cotter pins are better for workability.

P1620165
The fairing cracked, so they asked if we could do something about it. The grommet fits, but clearance-wise we determined plastic won’t work. We made a catch plate from titanium T=0.8 and bonded it in place.

P1620166
A few hours later… it stuck perfectly.

P1620167
Even pushing hard, it holds. The catch and titanium spring feel great.
The muffler should arrive by next week, so we should be able to deliver it this weekend.

 

 

  • Copied the URL !