Z1000LTD NGC Engine Source Etc

DSC_7761
Let’s swap out the meter. We embedded a PIVOT.

DSC_7689 DSC_7687 DSC_7686
The speedometer has a slightly different shape. In the end, we ground down the bracket to make room.

DSC_7640
It won’t fit when it’s in the case, and the double lens is a bit tricky. After much deliberation, removing the cover gets it in flush.
DSC_7642
Working on brand new parts like this is really nerve-wracking, so we’re being extra careful.

DSC_7646
We could have bent it into a U-shape, but considering the height, positioning, mounting, and the need for tools to fit, we went with the safe option.

DSC_7651
It got scorched from welding, so we painted it. SUS304, 2mm thick.

DSC_7668
We made a hole for the wiring to pass through, cleaned it up, and painted it. It’s not visible, but it feels good.

DSC_7736
We’re pretty fond of the 040 3-piece connectors and keep them in stock.

DSC_7735
We replaced all the small fasteners too.

DSC_7733
It came out nice and clean.

DSC_7758
We went back and forth on a few things, but it’s done for now.

It really takes a lot of work…

DSC_7740

There are surprisingly a lot of odds and ends, which is a pain, but at least there’s no H4 connector to deal with.

We’ll take it for a test ride tomorrow and call it done.

  • Copied the URL !